NAPLES, FLORIDA · 14-STAGE PROTOCOL

The Restoration Process.

Every vessel follows a documented, multi-phase protocol — from initial inspection through final mirror-finish verification. Locally owned and operated by a lifelong Naples native who built this practice on Gulf Coast standards.

Before restoration
After mirror finish
chevron_leftchevron_right
BEFOREMIRROR FINISH

← Drag to see the result of our full process →

PHASE 01–04

Assessment & Decontamination

Spectral inspection, iron decontamination, and wash protocols tailored to gelcoat density and marina environment.

PHASE 05–08

Correction & Refinement

Multi-stage compounding and orbital refinement to eliminate oxidation, swirls, and sub-micron marring.

PHASE 09–12

Ceramic Integration

Layered SiO2 application with controlled curing for permanent hydrophobic protection in salt-rich waters.

PHASE 13–14

Final Verification

Gloss-meter readings, hardware detailing, and owner walkthrough before handoff.

Ready to Begin?

Schedule a vessel assessment at your Naples-area marina or private dock.

Request a Consultation